the Level of Qualification
Determining the Level of Qualification Before determining what testing needs to be performed in the Factory Acceptance Test (FAT) or any other commissioning or qualification test, one needs to determine…
Determining the Level of Qualification Before determining what testing needs to be performed in the Factory Acceptance Test (FAT) or any other commissioning or qualification test, one needs to determine…
Introduction Subpart D2 of the Code of Federal Regulations is dedicated to equipment. 21 CFR 211.63 deals with design issues, 211.65 with construction, 211.67 and 68 deal with maintenance, cleaning,…
Basic Risk Approach4 A risk-based program needs to be established at the very beginning of the process validation program. Some criteria to be included in this risk program are: • Documentation…
Standard Operating Procedures (SOPs) Preparation In the preparation of SOPs there are often higher levels of documents that control the functionality of the various systems and operations. At a corporate…
Getting Started (After the Equipment Specifications) Process validation cannot begin when the first commercial size batch is produced. It must start much earlier. In reality, process validation begins in the…