Before determining what testing needs to be performed in the Factory Acceptance Test (FAT) or any other commissioning or qualification test, one needs to determine the level of testing required. This is primarily determined by the amount of product contact and its criticality to the process. In determining the type and extent of the qualification needed for a particular piece of equipment the extent of its product contact needs to be considered:
Determining the Level of Qualification